Publication: กระบวนการสร้างสรรค์สถาปัตยกรรมในรัชกาลพระบาทสมเด็จพระจอมเกล้าเจ้าอยู่หัว (พ.ศ. 2394-2411)
Submitted Date
Received Date
Accepted Date
Issued Date
2022
Copyright Date
Announcement No.
Application No.
Patent No.
Valid Date
Resource Type
Edition
Resource Version
Language
th
File Type
No. of Pages/File Size
ISBN
ISSN
2697-4665
eISSN
DOI
Scopus ID
WOS ID
Pubmed ID
arXiv ID
item.page.harrt.identifier.callno
Other identifier(s)
Journal Title
วารสารหน้าจั่ว ว่าด้วยสถาปัตยกรรม การออกแบบ และสภาพแวดล้อม
NAJUA: Architecture, Design and Built Environment
NAJUA: Architecture, Design and Built Environment
Volume
19
Issue
1
Edition
Start Page
94
End Page
123
Access Rights
Access Status
Rights
Rights Holder(s)
Physical Location
Bibliographic Citation
Research Projects
Organizational Units
Authors
Journal Issue
Title
กระบวนการสร้างสรรค์สถาปัตยกรรมในรัชกาลพระบาทสมเด็จพระจอมเกล้าเจ้าอยู่หัว (พ.ศ. 2394-2411)
Alternative Title(s)
Architecture as a Process during the Reign of King Mongkut (1851–1868)
Author(s)
Author’s Affiliation
Author's E-mail
Editor(s)
Editor’s Affiliation
Corresponding person(s)
Creator(s)
Compiler
Advisor(s)
Illustrator(s)
Applicant(s)
Inventor(s)
Issuer
Assignee
Other Contributor(s)
Series
Has Part
Abstract
บทความนี้มุ่งศึกษากระบวนการสร้างสรรค์สถาปัตยกรรมในรัชกาลพระบาทสมเด็จพระจอมเกล้าเจ้าอยู่หัว (พ.ศ. 2394-2411) รวบรวมข้อมูลจากเอกสารชั้นต้นประเภทเอกสารลายลักษณ์ วิเคราะห์ข้อมูลโดยใช้กรอบทฤษฎีสังคมวิทยาวัฒนธรรม ประกอบกับเอกสารทุติยภูมิ ผลการศึกษาพบว่า (1) บุคลากรในการออกแบบและก่อสร้างมี 5 กลุ่มหลัก คือ แม่กอง นายช่าง นายด้าน-นายงาน ผู้รับเหมา และแรงงาน โดยสามกลุ่มแรกและแรงงานเลกไพร่เป็นส่วนหนึ่งของระบบอุปถัมภ์ในสังคมแบบจารีต ส่วนบุคลากรกลุ่มใหม่ คือ ผู้รับเหมาและแรงงานชาวจีน ซึ่งเริ่มทดแทนระบบเลกไพร่ และเป็นส่วนหนึ่งของความเปลี่ยนแปลงในระบบภาษีและการค้ากับต่างประเทศที่มีมาตั้งแต่รัชกาลที่ 3 (2) กระบวนการผลิตและจัดหาวัสดุก่อสร้างเป็นการเกณฑ์ส่วยตามระบบจารีต ควบคู่กับการนำเข้าวัสดุใหม่ ๆ จากต่างประเทศ ขณะที่การขนส่งวัสดุยังใช้พาหนะแบบโบราณ แต่ก็เริ่มมีการใช้เรือกลไฟช่วยอำนวยความสะดวกในการขนส่งวัสดุก่อสร้าง และ (3) ขั้นตอนในการออกแบบและก่อสร้างยังคงเป็นระบบจารีต พระมหากษัตริย์ทรงเป็นศูนย์กลางของสังคม พระราชนิยมจึงส่งผลต่อสถาปัตยกรรมในหลายมิติ ทั้งการก่อสร้างพระราชวังและพระอารามตามหัวเมือง การรื้อฟื้นรูปแบบสถาปัตยกรรมไทยโบราณ ควบคู่ไปกับการรับสถาปัตยกรรมและศิลปกรรมแบบตะวันตก
This research article examines the process of making architecture during the reign of King Mongkut (1851–1868), through the collection of primary textual data as well as secondary historical materials, and the analysis through cultural sociology theoretical framework. There are 3 major findings: (1) There were 5 major groups of people in the process–project managers, master builders, supervisors, contractors, and labors. The first three groups and the corvée labors were intrinsic to the patronage social structure in the traditional manner, while contractors and Chinese labors were new groups which began to replace the old corvée system, a part of changes in revenue system and foreign trade which began since the reign of King Nangklao
(2) The production and procurement of construction materials was primarily based on traditional corvée system, in conjunction with the importation of new construction materials from abroad. Transportation of materials remained very traditional, yet new modes, such as steamboats, helped facilitate transportation system
and (3) The design and construction process remained very traditional. The king was the social epicenter, and his predilections had a lot of impact on architecture in many dimensions, including the construction of provincial palaces and monasteries, the revival of ancient Thai architectural forms, as well as the importation of Western architectural and artistic forms.
This research article examines the process of making architecture during the reign of King Mongkut (1851–1868), through the collection of primary textual data as well as secondary historical materials, and the analysis through cultural sociology theoretical framework. There are 3 major findings: (1) There were 5 major groups of people in the process–project managers, master builders, supervisors, contractors, and labors. The first three groups and the corvée labors were intrinsic to the patronage social structure in the traditional manner, while contractors and Chinese labors were new groups which began to replace the old corvée system, a part of changes in revenue system and foreign trade which began since the reign of King Nangklao
(2) The production and procurement of construction materials was primarily based on traditional corvée system, in conjunction with the importation of new construction materials from abroad. Transportation of materials remained very traditional, yet new modes, such as steamboats, helped facilitate transportation system
and (3) The design and construction process remained very traditional. The king was the social epicenter, and his predilections had a lot of impact on architecture in many dimensions, including the construction of provincial palaces and monasteries, the revival of ancient Thai architectural forms, as well as the importation of Western architectural and artistic forms.